RECONSTRUCTION AND EXTENSION OF PRODUCTION OF PILLS N2 AND N3

Client: Balkanpharma, Dupnica
Site Location: Dupnica, Bulgaria
Description of work: General Contractor
Surface area: 3 000 m²
Start of execution: 2014
End of execution: 2015

Project description:

Tablet plant 2 is located in the complex of the investor company – Balkanpharma Dupnitsa AD, owned by Actavis EAD.
The extension of the existing building shall include partial construction to the south and complete super construction of the transport corridor to the north of the building – along the entire length of the existing volume.
To the east the building shall keep the covered pass to the tablet plant 3 and the warehouse area.
The newly designed parts shall keep the access ways to the building. The transport and installation connections in the complex shall not be subject to change.
Cordeel Bulgaria performs:

  • The new solid and metal construction in the buildings – forming part of the extension.

  • Building water supply and sewerage installation;

  • Finishing architectural and construction and installation works in the new premises;

  • Building Electrical installations.

  • Roof vacuum drainage;

  • Grounding and lightning protection installation;

  • Field Water Supply and Sewerage systems;

  • Recovery of landscaping around buildings forming part of the extension;