WASTE DEPOT

Client: Environmental Project Management AD, Bulgaria    
Site Location: Kostinbrod, Bulgaria
Description of work: Investment consultancy and authorization documents, Еngineering and Тurnkey construction
Surface area: 110 470 m²
Start of execution: 2011
End of execution: 2011

Project description:
First stage of the "Regional waste depot for the municipalities of Kostinbrod, Bozhurishte, Dragoman, Godech, Slivnitza, Svoge" project near the village of Bogyovtsi in the Gonyarevi padini area, including.
External water supply system for the regional depot for non-hazardous and inert waste for the municipalities of Kostinbrod, Svoge, Slivnitza, Bozhurishte, Godech and Dragoman - new reservoir; reconstruction of the Bezden pumping station, pusher pipeline from Bezden pumping station to the pressure tank of the Kostinbrod regional depot for solid waste with a length of 5636 m; a 160m3 pressure tank; new pumping station in pressure tank; pusher pipeline from the Bezden pumping station to a connection with an existing pipeline from the Opitsvet pumping station at the Bogyovtsi pressure tank with a length of 1025 m and
External power supply – cable average voltage 20 kV, complete transformer substation 1x400kVA/20.0.4kV and LV cable to power the switchboard at the regional depot for non-hazardous and inert waste for the municipalities of Kostinbrod, Svoge, Slivnitza, Bozhurishte, Godech and Dragoman

The scope of this project consists of the following construction works:
Earthworks - Cut / Fill - 52 000 m3
Operational route - bottom groove, asphalt works, security ditches - 1080 m’
Laying of insulation package for waste cells and retention basin - 17,892 m2
Laying of geotextile - 21,403 m2
External road link - bottom groove, asphalt works, drain ditches, curbs, road signs - 160 m’
External power supply - medium voltage cable 20 kV and Nominal - 336 m
External power supply - complete transformer substation 1x400kVA, LV cable to the main switchboard
External water supply - new reservoir, reconstruction of the Bezden pump station
Pusher pipeline- 5636 m and 1025 m
Fence and forest protection layer - 1860 m’
Farmyard - platform power supply, plumbing, landscaping, planting: 8.8 acres
Buildings - administrative building, checkpoints, garage workshop
Supply and installation of equipment – sewerage treatment facility, electronic scale (60 tons, 18 by 3 m), facility for washing tires, automatic barrier, diesel engine, radioactivity monitor