State-of-the-art production plant for OSRAM
![osram_3.jpg](https://cdn.cordeel.eu/sites/cordeel_cdn/files/styles/tu_extensive_500x500/public/2019-05/osram_3.jpg?itok=OCjk1rxg)
![osram_2.jpg](https://cdn.cordeel.eu/sites/cordeel_cdn/files/styles/tu_extensive_500x500/public/2019-05/osram_2.jpg?itok=UmBjAUlj)
Project properties
Phased construction in three stages
Construction took place in three stages, allowing for staff training, installation of equipment and manufacturing to be carried out during the building activities.
- Phase 1 - Construction of a third of the production zone, warehouse and offices
- Phase 2 - Completion of production zone and distribution of technical equipment and relevant installations
- Phase 3 - Design and construction of specialised production areas with specific requirements
High requirements and specific building installations
All work was carried out to client specifications. This included establishing a production area with ESD flooring, heating and air-conditioning. A temperature and humidity monitoring system, high-level microclimate and lighting in work areas and compressed air and nitrogen installations were also incorporated. In addition, Cordeel installed a VdS-certified sprinkler system and tank as well as fire safety facilities in compliance with the highest EU standards. A tempered warehouse zone with detached explosion protection for hazardous materials as well as a non-spark flooring system were included too.