State-of-the-art production plant for OSRAM
Project properties
Phased construction in three stages
Construction took place in three stages, allowing for staff training, installation of equipment and manufacturing to be carried out during the building activities.
- Phase 1 - Construction of a third of the production zone, warehouse and offices
- Phase 2 - Completion of production zone and distribution of technical equipment and relevant installations
- Phase 3 - Design and construction of specialised production areas with specific requirements
High requirements and specific building installations
All work was carried out to client specifications. This included establishing a production area with ESD flooring, heating and air-conditioning. A temperature and humidity monitoring system, high-level microclimate and lighting in work areas and compressed air and nitrogen installations were also incorporated. In addition, Cordeel installed a VdS-certified sprinkler system and tank as well as fire safety facilities in compliance with the highest EU standards. A tempered warehouse zone with detached explosion protection for hazardous materials as well as a non-spark flooring system were included too.